01 · Detail
Smart home wiring for new builds — done at lockup, not after
The single biggest mistake on a new build is leaving smart home wiring until handover. Once the plaster is on, every cable run becomes a battle — fishing through ceilings, cutting plates, hoping the builder hasn't filled the cavity with insulation. Done at lockup, the same job takes a fraction of the time and the result is invisible.
We work with Perth's premier builders — Zorzi, Webb & Brown-Neaves, Atrium, Oswald, Mondo — and slot into the build program at first fix. We supply the electrician with cable schedules, panel layouts and termination diagrams, then return at second fix to terminate, test and commission.
- 01First-fix cable schedule supplied to the electrician
- 02Cat6, speaker, HDMI, lighting and shading runs to every room
- 03Future-proofed conduits where flexibility matters
- 04Final commissioning and household handover before practical completion